I am working in a Refinery project . The project specification for underground drainage for Oily water sewer system says that " Vent shall be installed in the following locations (1) upstream of the first sealed Manhole in a Oily water drainage system ( 2) Down stream of the farthest catch basin (3) Those section of the drainage line located between liquid seals.
Can anyone explain why the vent should be installed in the upstream of the first sealed Manhole. The Oily water sewer system consist of a number of catch basin connected into a main branch which drains into a manhole .Like that Manholes are connected one by one and draining out of battery limit. My question is that if the downstream of catch basin have a vent then why again on the upstream of the Manhole. Is it to protect the water seal of the Manhole?
Can anyone explain why the vent should be installed in the upstream of the first sealed Manhole. The Oily water sewer system consist of a number of catch basin connected into a main branch which drains into a manhole .Like that Manholes are connected one by one and draining out of battery limit. My question is that if the downstream of catch basin have a vent then why again on the upstream of the Manhole. Is it to protect the water seal of the Manhole?