meanderson3d
Chemical
- Jul 23, 2008
- 9
I am designing a NGL processing facility and need some help with the vent system design. Since the facility is essentially liquid packed, purge gas is not available to keep a positive pressure on the vent system to prevent air ingress. The only time the vent system will see a flow is in the case of PSV release. I found this thread - thread124-219538 - which does have one idea that has possibility - detonation arrester. Does anyone have any other ideas to prevent air ingress into the system? Thanks.