Hi everybody, I am supervisor of a reinforced concrete tower, the
contractor uses slipform as formwork of all the vertical elements
like shear walls, core walls and columns, it can not pour concrete
more than one floor height in one time casting because of installing
stirrups and other horizontal steel bars through it and some other difficulties .I think the
construction is not proceeding at a good pace and maybe it is better
to use slipform only for walls. I will appreciate if you tell me your experience about the issue.
contractor uses slipform as formwork of all the vertical elements
like shear walls, core walls and columns, it can not pour concrete
more than one floor height in one time casting because of installing
stirrups and other horizontal steel bars through it and some other difficulties .I think the
construction is not proceeding at a good pace and maybe it is better
to use slipform only for walls. I will appreciate if you tell me your experience about the issue.