Hi,
Could I some advices about UPS load test (burn-in test)?
Is it common to do the burn-in test with reactive load, with both leading and lagging power factor load, given the UPS is specified to e.g. 0.8 leading and lagging power factor without de-rating? I just wonder if all the UPS manufacturer's support this type of test in their factory or on site.
Thanks
MP
Could I some advices about UPS load test (burn-in test)?
Is it common to do the burn-in test with reactive load, with both leading and lagging power factor load, given the UPS is specified to e.g. 0.8 leading and lagging power factor without de-rating? I just wonder if all the UPS manufacturer's support this type of test in their factory or on site.
Thanks
MP