Dec 9, 2016 #1 Joss10 Mechanical Joined Dec 27, 2012 Messages 108 Location AR Is it right using values in Table 2 from NACE SPO775-2-2013 to assume unknown corrosion rates?? Thanks,
Is it right using values in Table 2 from NACE SPO775-2-2013 to assume unknown corrosion rates?? Thanks,
Dec 9, 2016 #2 SJones Petroleum Joined Apr 22, 2001 Messages 3,948 Location GB No. Read the first sentence of 5.1.1 and note the use of the word "measured." If the rates have been measured, how can they be unknown? Perhaps the specific context of the question can be elaborated upon? Steve Jones Corrosion Management Consultant http://www.linkedin.com/pub/8/83b/b04 All answers are personal opinions only and are in no way connected with any employer. Upvote 0 Downvote
No. Read the first sentence of 5.1.1 and note the use of the word "measured." If the rates have been measured, how can they be unknown? Perhaps the specific context of the question can be elaborated upon? Steve Jones Corrosion Management Consultant http://www.linkedin.com/pub/8/83b/b04 All answers are personal opinions only and are in no way connected with any employer.