EmbassyConstruction
Civil/Environmental
- Jan 9, 2007
- 1
We are using 4" glued Schedule 80 PVC pipe. We are allowed 1.89L/hr/100joints of leakage. We have 28 joints, in 560 feet of underground pipe. We are losing 4psi over a two hour period. How do we convert this PSI reading to Liters/hour?