Laly
Electrical
- Sep 27, 2010
- 1
Hello everyone, I'm currently working on a project where the new underground cable route will be crossing an existing undergound cable route at various locations. The existing and new underground cable systems are both 34.5 kV. The idea is that the new cables need to be sized and spaced accordingly such that they don't cause any derating in the existing cables due to heating effects. I'm taking a look at the Neher-McGrath method but it seems to deal more with derating of cables based on one system. Anyone has any information/references I can look at on derating of cables based on systems that cross or are in near proximity of each other? Not having much luck with search online.
Thank you
Thank you