Attached is the truss drawing and the truss company added a note that the floor system must be designed to resist a 918 lb tension force and the gambrel frame must be connected at each end for a 459 lb horizontal reaction.
What is the best way to do this?
The owner prepared the plans himself so I don't have much information except the truss drawings and that the floor system will be 2x12's at 16" o.c. with 3/4" subfloor.
What is the best way to do this?
The owner prepared the plans himself so I don't have much information except the truss drawings and that the floor system will be 2x12's at 16" o.c. with 3/4" subfloor.