xxxxxxxxssssssssssss sw line a
------------xxxxxxxx sw line b
xxxxxxxsssssssssssss sw line c
This is what I mean. x denotes shearwall, s denotes bearing walls, ---- denotes the location of the drag strut.
Wood trusses are to be installed perpendicular to the shearwall.
Question:
In shearwall lind B , can I just continue the top plate and serve as the drag strut along that line? Im planning to nail it to the bottom of the solid blocking that will be positioned along that line also? (building has a flat roof)
thanks
noel