loukasse
Mechanical
- Jul 31, 2021
- 2
Good morning,
During trench excavation for a 16-inch pipeline, we encountered water at a depth of 1.5 meters b(200 meters length ), while the required trench depth is 2 meters.
Could you please suggest a suitable solution to proceed with the bedding and pipe lowering activities under these conditions?
During trench excavation for a 16-inch pipeline, we encountered water at a depth of 1.5 meters b(200 meters length ), while the required trench depth is 2 meters.
Could you please suggest a suitable solution to proceed with the bedding and pipe lowering activities under these conditions?