Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Treating Cold Joints in Walls

Status
Not open for further replies.

hike

Structural
Joined
Dec 29, 2003
Messages
1
Location
CA
Hello,

How are cold joints in plain concrete walls typically treated? Are adhesives used to bond the next pour on top of the already set concrete or are dowels inserted to connect the cold joint?

Any input would be appreciated.

Thanks in advance,
Hike
 
Beyond Dick's reply, cold joints are normally treated as joints and no special bonding is used. If it is a matter of preventing water from penetrating the joint, then a waterbar or properly designed caulked joint can be used. If load transfer is required, consider using dowels and/or a keyway. Cold joints are generally a consequence of the contractor planning a discrete pour based on his schedule or what he thinks he can complete in a day.

Dik
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top