unnikri57
Electrical
- Apr 22, 2006
- 6
I have a installation designed with a duty standby transformer .in case of failure of duty transformer the standby one will take the full load. normaly standby will have no load connected.
I wonder will it be better to load both transformer 50% and incase of failure of one transformer,the other transformer will be loaded 100%.
I wonder will it be better to load both transformer 50% and incase of failure of one transformer,the other transformer will be loaded 100%.