I am looking for an efficient way to track and forecast engineer resources amongst a small design team. The design team resources are split amongst several projects so I'm looking for a way to track resources at an operations level (not necessarily detailed within each project) to provide a real-time snapshot of resource loading.
Ideally I'd like to be able to tie engineering hours from each project ( budgeted hours, hours used, etc..) to provide forecasting of engineer resources on a 3-month look ahead to compare available resources against projects in pipeline.
Anyone have any good suggests on what type of tool to use for this? Would Microsoft project be an efficient tool if individual project schedules fore each project are already created and can be pulled from to develop engineering resource schedule?
Currently we are trying to track this using various different spreadsheets which becomes cumbersome and time consuming and never really provides an accurate picture since project resources for a given project are never considered along with future resource loading since these are tracked separately.
Thanks for any advice.
Ideally I'd like to be able to tie engineering hours from each project ( budgeted hours, hours used, etc..) to provide forecasting of engineer resources on a 3-month look ahead to compare available resources against projects in pipeline.
Anyone have any good suggests on what type of tool to use for this? Would Microsoft project be an efficient tool if individual project schedules fore each project are already created and can be pulled from to develop engineering resource schedule?
Currently we are trying to track this using various different spreadsheets which becomes cumbersome and time consuming and never really provides an accurate picture since project resources for a given project are never considered along with future resource loading since these are tracked separately.
Thanks for any advice.