civilbjp
Civil/Environmental
- Jan 6, 2003
- 18
Could someone tell me how to handle a time of concentration in TR-55 to take into account a vertical wall, specifically in the case of water flowing into a quarry. In addition, could someone tell me where to measure your wetted perimeter and area in channelized flow. Specifically in a case where the typical ditch has 3:1 side slopes extending up for 4 feet; however, the stream flowing through the channel flows within a 1' deep x 2' wide rectangular cut in the base of the channel. Is the wetted perimeter assuming full flow conditions at the top of the 4 feet or is my area only the 1'x 2' rectangular channel in the bottom of the channel. Is there a good document that clearly describes how to measure channel flow geometrics? Any help would be greatly appreciated.