CaucasianPersuasion
Petroleum
- May 31, 2014
- 1
We received some chrome pipe spools back from post weld heat treat the other day and noticed that they were bowed. Some were up to 1-1/8" out of square according to the string line we pulled on them. I have been looking for 2 days for something in the code that will tell me what the tolerance is for this? (like a 1/2" for every 20' or something to that extent is what I'm needing to know) We've done all other necessary testing on the spools now just need to know if they're within the tolerance. This is all built to B31.3. I looked there and was unsuccessful. Any help as to where I can find what we're allowed would be greatly appreciated.