ecope
Mechanical
- Dec 8, 2005
- 14
Hello, is there a timer in SolidWorks like in AutoCAD that keeps track of the time you started and how much time the drawings has been opened? If so how can I view the time in SolidWorks to see when and how much time I started on a project?
If so is there anyway of resetting the time?
Thanks!
If so is there anyway of resetting the time?
Thanks!