Hi,
thanks for the replies.
SlideRuleEraa; Yes that's my starting ball park number as well.
JedClampett; Load Testing is for sure where we need/will end up. Access for testing and condition assessment though is very difficult and complicated.
It is a waterfront structure, a port, an elevator with a capacity of 155,000 tons of product alone.
so at 20 tons per pile, never mind condition, down drag, etc., etc., the drawings indicate 4,800 piles, 155,000/4,800 = 32 tons per pile product only and that doesn't include the weight structure or any other loads such as berthing.