I would like to know the shop procedure for hydrostatic test butt weld end valve as per API 598. This procedure should be more difficult than flange end valve. Do the manufacturer weld and cut the spool after pressure testing? Do they carry out PWHT after testing low alloy steel valve body? Anyone who has experience in valve factory please advise me.