Einsteim
Structural
- Jan 10, 2008
- 76
I am looking for a reference on Tangent Auger Cast Walls for a comparative study our firm is doing. This project will require a 15'-20' +/- excavation cut. Interlocking sheet piling and driven steel piles with wood lagging will also be considered.
If anyone has some type of reference with examples, it would be appreciated. Thanks.
If anyone has some type of reference with examples, it would be appreciated. Thanks.