ChristopherFehr
Mining
- Mar 16, 2005
- 13
As part of our process I will have to reduce the level in a small lake that forms on top of our waste rock containment by about 1 meter. The average inflow is 900 US GPM and the water will only have to be piped a short distance overt he final spill way. How would I get the flow started? I assume I will have to run the discharge to a lower elevastion than the suction, just enough to cover the head loss in the pipe?