If ACI doesn't has any super-p requirements, do you kow any rule of thumb from concrete engineering points of view?
So far all I found out is to use super-p on 10,000psi or higher strength, on shearwall and/or columns with pump mix(pearock).
Remaining highrise concrete can be regular mix pumped to place for elevated slab without super-p or pump mix
Any advice?
If ACI doesn't has any super-p requirements, do you kow any rule of thumb from concrete engineering points of view?
So far all I found out is to use super-p on 10,000psi or higher strength, on shearwall and/or columns with pump mix(pearock).
Remaining highrise concrete can be regular mix pumped to place for elevated slab without super-p or pump mix
Any advice?