MJCronin,
The hole was patched up by welding a sleeve that will buy me some time. Putting a steel plate is a good option but there are 7 nozzles in 5 meter long 10" manifold. I was told by the stake holders that sand is coming from all wells in varied quantity.
Had this been one well I could have proposed a plate, as you suggested or a Target Tee with a flange, infront of the nozzle. This way the fluid flow would be hitting plate or the flange and not the manifold wall. However, it is not possible due to number of nozzles.
This leave me three choices (a) a steel cladded pipe (b) a duplex pipe (c) any other proposal?
Based on captioned explaination, I will be interested in knowing any other option and if clading solution is possible, practical and economical as compared to a full duplex manifold.
By the way GOR is 6100