Sub-Slab Depressurization

Status
Not open for further replies.

DrDarrell

Mechanical
Joined
Apr 25, 2001
Messages
22
Location
US
I have been approached by a survey team who suggest that I need to do a "...Sub-Slab Depressurization..." on my building. I have a 20,000 sq. ft. commercial structure with a 30ft high roof.

I have been surfing the web for some information regarding the need and cost of this procedure. I have determined that this is primarily reserved for the metering off of Radon Gases from residential properties.

I have a couple of questions:

1) Is it possible to perform Sub-Slab Depressurization on a building of this size?

2) Is it necessary to perform Sub-Slab Depressurization on a well-ventilated building of this size?

3) What would be the cost of this procedure, ($100's or $1,000,000's)?

Sources for supporting documentation would be appreciated.

Thank you in advance for any guidance you provide.

Respectfully,
Darrell
 
Where did these guys come from? Talk to the BBB first. Sounds like a scam operatio to me. How much pressure would radon gas generate?
 
I would first determine if this is necessary and required. You would want to do your own survey. If YOU DECIDE it is necessary, then hire somebody else to do the work.
 
Yep, sounds like a scam. Demand references...and check them thoroughly. And checking with the BBB is a great idea. Also check with some of the local environmental engineering firms - they may have run into these guys before and know their MO.

[pacman]

Please see FAQ731-376 for great suggestions on how to make the best use of Eng-Tips Fora. See faq158-922 for recommendations regarding the question, "How Do You Evaluate Fill Settlement Beneath Structures?"
 
From what I have seen sub-slab depressurization is normally used to vent methane from decomposing organics under your building. You may want to look at what the soild conditions are. Normally the venting is rather inexpensive, mainly some vents to let the gas out from under your concrete.
 