If structural demolition is required, then we show it because its part of the project scope. I will not require the means and methods to do it, but I will sometimes spell out a suggested sequence of demolition (i.e. how I would do it). I will also flag critical structural items that the contractor should be aware of when preparing his demo sequence, such as load bearing walls or other items that may not be intuitively load bearing or critical. We also flag the removal of slabs that brace the compression flange of beams or diaphragms that could affect a member's load carrying capacity if they are removed and the load is not.