[tt]Dears
The contractor remove (strip) the formwork beofore assigned time.
Whats is the needed tests and measurement to check the slab, and ensuring that no defects or serviseability problems occures.
And if there is a reference for codes or handbooks, please speicify.

Thanks


[/tt]
 
In the US, guidance on shoring and reshoring of concrete is addressed in ACI 347.2
 
In addition to the ACI link. Was it immediately reshored? Stripping early leads to greater long term deflection issues.

-----*****-----
So strange to see the singularity approaching while the entire planet is rapidly turning into a hellscape. -John Coates

-Dik
 