I have an existing slab that is changing from a carpark usage to retail. I have done a few numbers for punching shear with the the higher design loads and believe that the structure needs to be strengthened.
Has anyone got some good reference material on how to strengthen the slab. I am thinking of either a bonded topping or shear collars. I have heard alot about both of these methods but have not been able to find any literature.
Also, what are the steps I need to take in order to ensure a bonding topping will work for me in punching shear?
I have an existing slab that is changing from a carpark usage to retail. I have done a few numbers for punching shear with the the higher design loads and believe that the structure needs to be strengthened.
Has anyone got some good reference material on how to strengthen the slab. I am thinking of either a bonded topping or shear collars. I have heard alot about both of these methods but have not been able to find any literature.
Also, what are the steps I need to take in order to ensure a bonding topping will work for me in punching shear?