It depends on who you listen to.
- Many people say 5D is the rule.
- Many people say 10D is the rule.
- Many people are now saying that all pump discharges should have two check valves and these check valves should have 10D upstream of both the first Check Valve and the second Check Valve, plus 5D downstream of the second Check Valve before the Block Valve or elbow.
Now spend a little time looking at the different sized pumps (maybe 8" suction & 6" discharge and larger) we now find in the typical Mega-sized plants and see what the pump piping will look like, then go and sell it to the CEO of your current Client
- The consensus of past installations tells us minimum works and is the most cost effective when considering the cost of Real Estate inside the fence of a plant and the extra cost for pipe supports, stairs or ladders and platform to get over or around the obstructions.
prognosis: Lead or Lag