armyengr
Civil/Environmental
- Oct 31, 2007
- 6
Are there any suggestions to solve the following problem? I am working on a site, RV park, that will disturb approximately 2.7 ac without mass grading (drainage area is about 6.5 ac). The problem is with the new pervious area my 10yr post exceeds the 10 yr pre which now requires detention. Unfortunately the area is confined and the required area is not available for a pond,swale or any other permanent structure. I am looking at porous concrete for Pads but am having difficulty quantifying the reduction of runoff. Any suggestions are greatly appreciated.