When designing the stitch nailing for doubled 2x's (where used at abutting shearwall panels), is the design load used to calculated the required stitch nailing simply the shearwall capacity.
thanks- what about at holdowns. Perhaps, I should determine
tension due to O.T. moment and compare this to shrwall capacity...then design for controlling. Currently I have some HD with through bolting and some with the Simpson screws (eg PHD's).
Ah---let me try again. My first post had to do with stitch nailing at abutting shrwall panels, but now I'm wondering if the stitch nailing of a dbl 2x at a shrwall "endpost" would be subjected to additional demands.........i.e.due to overturning forces in the shrwall chord.
Any thoughts are appreciated.