I am looking for skid fabricator for metering pumps system with the following requirement
Other documentation shall include : quality manual, quality certificate, WPS, NDT procedure, Coating procedure, QA/QC document and all related to fabrication of the skid.
Detail engineering will be done by us
Major pump, equipment, valve, instrument and Transmitter, flow instrument
Material
- Skid by Vendor
- Piping, fitting and support and bolt and nut within the skid by Vendor
- Cable within the skid by Vendor
Fabrication
- QA/QC by Vendor
FAT/ Testing
- Hydrotest/pneumatic test by Vendor.
- Owner will attend at Vendor.
Estimate each skid is less than 5MT total weight.
Material for the strucrcture, pipe, pipe support and cable shall be provided.
Can anyone recommend me the vendor for this
I am looking for skid fabricator for metering pumps system with the following requirement
Other documentation shall include : quality manual, quality certificate, WPS, NDT procedure, Coating procedure, QA/QC document and all related to fabrication of the skid.
Detail engineering will be done by us
Major pump, equipment, valve, instrument and Transmitter, flow instrument
Material
- Skid by Vendor
- Piping, fitting and support and bolt and nut within the skid by Vendor
- Cable within the skid by Vendor
Fabrication
- QA/QC by Vendor
FAT/ Testing
- Hydrotest/pneumatic test by Vendor.
- Owner will attend at Vendor.
Estimate each skid is less than 5MT total weight.
Material for the strucrcture, pipe, pipe support and cable shall be provided.
Can anyone recommend me the vendor for this