KOTOR1
Structural
- Jan 27, 2009
- 48
I have an existing column with additional load coming down due to a new mechanical unit (about 2500#) on the roof. The existing column was already over stressed due to the existing loads (as per my calculations by about 10%). The column is an HSS4x4x1/4 (14'-8" tall) w/ 28k DL and 13K LL (existing loads). I am assuming the column to be fully unbraced.
Would reducing the unbraced length by providing braces be the way to go or can I reinforce the column in some other way. The owner prefers not to replace the column due to various medical equipment around the column.
Would reducing the unbraced length by providing braces be the way to go or can I reinforce the column in some other way. The owner prefers not to replace the column due to various medical equipment around the column.