TonyE
Industrial
- Feb 24, 1999
- 4
Given a variety of products that are similar in their routing, but may have slight differences, what 'precision' is required for each product in the group of items for their run-time? Obviously, the group of products, if given ONE standard time for the group, will lose visibility to cost differences. However, if each product within the group is given a unique time to show the real difference in run-time, it becomes difficult to manage. Can someone give some advice as to logic that can be applied?