Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Starting Datums

Status
Not open for further replies.

Troy442

Mechanical
Oct 7, 2008
12
Seems like everytime we have a review of drawings there are many opinions of what the 3 "primary" datums should be. I am looking for some ideas from this group. I have attached a pdf of a single injection molded part. It will be inspected with a CMM touch probe. I have simplified the part for this discussion. There would be draft and ribs and small rounds etc. for molding.

This part holds a PC board with display and connector. There is another molded part that completes the enclosure and mounts to a wall.

So what are the thougts for A-B-C? Would you have a D or E?

Thanks, Troy GDTP-T-0386

 
Replies continue below

Recommended for you

Paul,

I have not been able to find referece online to Rectangular Ellipse, other than your explanation. Can you 9or someone else) direct me to a technical definition of one please.

Thanks

 
Status
Not open for further replies.

Part and Inventory Search

Sponsor