Dear all,

I am doing Static Simulation where the load(CLOAD) should be increased in the first step & when the contacts gets established between the components, the load should be stopped(Terminated) and moved into the next load step.

How can I proceed this problem and if any reference files are Existing please share.

Thanks
Shreyas
 
Thats only possible with a UAMP subroutine.
 
Hi,

Thanks for the reply..

Is it possible to share example or reference file?

Thanks
Shreyas
 
Search in the documentation main page and you'll find examples in different books.
 