Hello~
I am first here to post something~
My question is as follows~
Is there any way to convert 50 blows per 30cm into N blows per 30cm ?
For example, 50/15 means 50 blows were needed to penetrate 15cm.
What I want is that in the case of blow count which exceeds 30 blows like above example..how can I convert it to blow count needed to penetrate 30cm...
50/15 ---> ?blows/30cm
50/1 ---> ?blows/30cm
Sometimes it is needed to and wish to convert them to N-blow count per 30 cm....
Pleasre let me know the way to convert(if exists) and reference which concerns about it~
Thank u
I am first here to post something~
My question is as follows~
Is there any way to convert 50 blows per 30cm into N blows per 30cm ?
For example, 50/15 means 50 blows were needed to penetrate 15cm.
What I want is that in the case of blow count which exceeds 30 blows like above example..how can I convert it to blow count needed to penetrate 30cm...
50/15 ---> ?blows/30cm
50/1 ---> ?blows/30cm
Sometimes it is needed to and wish to convert them to N-blow count per 30 cm....
Pleasre let me know the way to convert(if exists) and reference which concerns about it~
Thank u