whitebalance
Structural
- Mar 23, 2010
- 28
Hi,
I have an static analysis with 5 steps.
The odb for the full analysis is big in size.
Is it possible to say in the input that the results from each step shall be written to seperate odb's?
K
I have an static analysis with 5 steps.
The odb for the full analysis is big in size.
Is it possible to say in the input that the results from each step shall be written to seperate odb's?
K