The inspection report shows the specification requirement:
Feature: Position
Specification: 12 X .125 +.002/.000 [(TruPos symbol) dia.002 (M) | A | B ]
When I perform the CMM measurement, I am not sure about the requirement of this callout:
All three holes (callout is actually a True position of the PCD of all holes)?
or individual hole True Position?
And could it be the same thing?
Thanks for the help!
Feature: Position
Specification: 12 X .125 +.002/.000 [(TruPos symbol) dia.002 (M) | A | B ]
When I perform the CMM measurement, I am not sure about the requirement of this callout:
All three holes (callout is actually a True position of the PCD of all holes)?
or individual hole True Position?
And could it be the same thing?