I am the SER on a project currently being constructed. The Architect basically abandoned the job a few months ago for unknown reasons. One item I'm concerned with is the specified (by myself) special inspection of masonry. At the onset of construction this requirement has been ignored by the general contractor, masonry sub and the architect for the age old reason - "We've never done that before". I'm still doing my periodic observations and writing / distributing the observation reports per contract with the Architect (unpaid of course) - each time making referance to this issue. The Architect (having bailed out) doesn't respond at all and construction continues. What's next - ?? - There's no code enforcement group involved due to location.