Ron:
FYI: We are not mixing flyash into the sand to stabilize it -actually it is the other way around. We have abundant flyash deposits. We are using 85% flyash (about 40% sand sized particles) and 15% fine to medium sand. For your information we are getting soaked CBR values in excess of 10 with this mix. For subgrade we are mixing 25% sand and 75% flyash - CBR soaked is >15. The only reason we aren't using flyash alone is that contractually, the contractor must mix soil and flyash. The "auditors" might make hay if we were not mixing something with the flyash. Flyash alone has the requisite soaked CBR. We chose 15% for embankments because, well, it can't be argued that it isn't a mix - we figured at 10% or less, one might argue that we were just paying lip service. Contract over-rules technical yet again.