I'm trying to understand why these kind of things happens in my country.
A 22 story building the supposed to be designed with ACI-318/95 Code but instead it was underdesigned to maximize the constructor gains.
In those moment that constructor, the construction manager and the designer have their houses as jail.
Designer and reviser of designs both lose their profesional card.
I'm trying to understand why these kind of things happens in my country.
A 22 story building the supposed to be designed with ACI-318/95 Code but instead it was underdesigned to maximize the constructor gains.
In those moment that constructor, the construction manager and the designer have their houses as jail.
Designer and reviser of designs both lose their profesional card.