Randy1111
Mining
- Jun 2, 2006
- 42
Hi folks.
Our company went ahead and purchased solidworks.
I'm now trying to get everythign set up correctly.
I've used pdmworks before just as secure storage, but not for revision control. We want to have prerelease drawings with alpha, and post release revisions be numeric. I want the revision letter in the title block to update automaticaly also.
I found
Which shows how a system can be set up similiar, but it uses placeholders like @. So instead of revision 03 i'd get revision @03. I'd like to have just A, B, C, etc and then when released have just 01, 02, 03.
Am I missing something here, or is there no way to have it list only primary, then switch and list only secondary?
-------------
Randy
Our company went ahead and purchased solidworks.
I'm now trying to get everythign set up correctly.
I've used pdmworks before just as secure storage, but not for revision control. We want to have prerelease drawings with alpha, and post release revisions be numeric. I want the revision letter in the title block to update automaticaly also.
I found
Which shows how a system can be set up similiar, but it uses placeholders like @. So instead of revision 03 i'd get revision @03. I'd like to have just A, B, C, etc and then when released have just 01, 02, 03.
Am I missing something here, or is there no way to have it list only primary, then switch and list only secondary?
-------------
Randy