All,
Further to my previous post and echoing PEinc, I would develop the earth pressures by hand or other calculation verified by hand calcs unless the soil conditions are simple.
The earth pressure (EPRES) module in Shoring has a tendency to not to handle non-homogeneous soil conditions properly. There are other less-serious problems with EPRES that I have found also.
A disadvantage of the LPRES module is that all surcharge loads are assumed to be applied at the same elevation, which is not always the case for, say, a combined construction surcharge and foundation loading situation. Shoring will, however, let you apply multiple LPRES pressures on the wall.
Note also that Shoring applies to vertical walls only. Battered walls will need to be analyzed by hand.
Jeff