In a recent meeting some folks were having a debate about how to approach a SOG where the floor is going to be covered with Mundo. Obviously they are concerned about the slab drying out before they covering can be placed. Some things I picked up in the meeting which I did not know before:
1) Slab needs to achieve 80% moisture evaporation in order for the flooring warranty to kick in (true/false?)
2) If the finish on floor is tile, then we need not worry about the moisture getting trapped as tile is breathable.
How would you guys approach this, because I also heard that in one instance they put fans for the floor to dry for months but no good came out of it. What type of concrete mix would you suggest and when can the start with the flooring?
Kaiser
1) Slab needs to achieve 80% moisture evaporation in order for the flooring warranty to kick in (true/false?)
2) If the finish on floor is tile, then we need not worry about the moisture getting trapped as tile is breathable.
How would you guys approach this, because I also heard that in one instance they put fans for the floor to dry for months but no good came out of it. What type of concrete mix would you suggest and when can the start with the flooring?
Kaiser