jharris3
Mechanical
- May 3, 2011
- 52
A couple years ago I had the opportunity to design a vessel that was installed at a facility in Alaska after the facility burned down. The schedule was tight with design, fabrication, and delivery to be achieved in 4 months.
The tower had two chambers, extra corrosion allowance for long life, and was in a fairly heavy seismic zone. Another of the requirements was to include snow loads on the platforms in the design that was 5 feet deep, and just for fun the client also wanted more platforms that were to be 24" wider than the original.
There is not any way to directly include snow loads in compress (and I don't blame codeware) so it was time to get creative.
I ended up using vertical eccentric loads to represent the weight of the snow on the platforms because these masses would then be included in the seismic weight of the vessel. I considered this to be a more severe load requirement than the appropriate load case from ASCE that would include snow loads.
The tower was not heavy to bigin with and we were to reuse the anchor bolts so the addition of 16000 lbs of snow plus some equipment on the platforms was a significant contributor to the problem.
What other ways would you have approached this problem using Compress?
The tower had two chambers, extra corrosion allowance for long life, and was in a fairly heavy seismic zone. Another of the requirements was to include snow loads on the platforms in the design that was 5 feet deep, and just for fun the client also wanted more platforms that were to be 24" wider than the original.
There is not any way to directly include snow loads in compress (and I don't blame codeware) so it was time to get creative.
I ended up using vertical eccentric loads to represent the weight of the snow on the platforms because these masses would then be included in the seismic weight of the vessel. I considered this to be a more severe load requirement than the appropriate load case from ASCE that would include snow loads.
The tower was not heavy to bigin with and we were to reuse the anchor bolts so the addition of 16000 lbs of snow plus some equipment on the platforms was a significant contributor to the problem.
What other ways would you have approached this problem using Compress?