Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Small site dry well sizing for 10 year storm

Status
Not open for further replies.

LincolnPE

Civil/Environmental
Joined
Mar 12, 2011
Messages
203
Location
US
thread162-321197

"As indicated by psmart, the Tc is very small (less than 5 minutes). Thoughb the municipality expressed that it would be up to the engineer to choose a rainfall duration for design. I guess I should choose a standard duration but I do not know what that standard would be."

The OP indicates a small site since the Tc is "less than 5 minutes". It is common industry practice to simply use the Modified Rational Method to approximate a reasonable runoff volume for the needs of a small site.
 