I agree with toones. You can't be sure that someone in the future won't remove a portion of the slab. Not only that, but if you eliminate the isolation joint between the slab and wall, then differential settlement will crack the slab. In addition to the other suggestions, I've seen the foundation wall extended to each side of the building, creating a lateral shear key, if you will.