How do you prevent sliding in your underpinning design prior to the installation of the new slab on grade?
I have an existing end-unit rowhouse. Two-story, wood framed structure with an existing crawlspace. The first floor wood joists bear on brick stem walls. We dug test pits, and I present to you, our scenario:
I have an existing end-unit rowhouse. Two-story, wood framed structure with an existing crawlspace. The first floor wood joists bear on brick stem walls. We dug test pits, and I present to you, our scenario:
