For an 8" slab on grade reinforced with #3 at 12" o.c. each way, is it better for the reinforcement to continue through control joints or be broken 2" each side of joint. Is a smooth, greased dowel required to allow horizontal movement but no vertical movement.
If no control joints are installed and the concrete is allowed to crack where it wants, will the rebar keep cracks from opening up? joints are 15'-19' o.c. depth of cut 2.66", rebar is centered in slab.