Mikelt98
Civil/Environmental
- Mar 26, 2007
- 2
I am designing a 20" water main. Client specifications require CAV's (they used Valmatic 200 C.2's on a recent 16" project) at high points, but offer no guidance on sizing/spacing. Can anyone point me to a reference? Thanks in advance!
Mike
Mike