i am trying to dimension the drain lines of a power station steam piping system. what are the dimensioning criteria?
i would assume it is the condensation of saturated steam admitted to the cold piping during startup.
are there any thumb rules to design the drain system properly to ensure proper condensate removal?
the idea is to install a steam trap for continuous condensate removal during normal operation and a pneumatic operated valve for startup. an orifice upstream the valve shall ensure correct flow rate during startup. how shall this orifice be dimensioned?
thank you very much for your inputs.
i would assume it is the condensation of saturated steam admitted to the cold piping during startup.
are there any thumb rules to design the drain system properly to ensure proper condensate removal?
the idea is to install a steam trap for continuous condensate removal during normal operation and a pneumatic operated valve for startup. an orifice upstream the valve shall ensure correct flow rate during startup. how shall this orifice be dimensioned?
thank you very much for your inputs.